Learning Course is designed to support learners. When you make a purchase through one of our links, we may receive an affiliate commission.

Schedule Network Diagram and Critical Path Method

Overview

This is a short training course about the Project Schedule Network Diagram and the Critical Path Method (CPM).

In this training course, you will learn the following topics:

  • What Project Schedule Network Diagram 
  • How to create a Project Schedule Network Diagram
  • How to determine the Critical Paths and calculate their length
  • How to determine the Near Critical Paths and calculate their lengths
  • What the Critical Path Method (CPM) is
  • How to apply the Critical Path Method (CPM)
  • How to perform a Forward Pass and Backward Pass on the network diagram
  • How to calculate the Early Start (ES) for activities
  • How to calculate the Early Finish (EF) for activities
  • How to calculate the Late Start (LS) for activities
  • How to calculate the Late Finish (LF) for activities
  • How to calculate the Float  for activities

This training course consists of 5 videos with total duration of more than 40 minutes .  The method used in this training course is narrated PowerPoint slides and step-by-step explanation.

Schedule Network Diagram and Critical Path Method

Reviews

John Doe
John Doe@username
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
John Doe
John Doe@username
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
John Doe
John Doe@username
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Scroll to Top